Demolition in the Emergency Department began 09/29/2025. Visitors can request earplugs from the nurse's station or any team member within the department. Thank you for your patience as we grow to serve you better.
Baptist Health Corbin is expanding to meet the growing healthcare needs of southeastern Kentucky. This transformative project represents a major investment in access, quality, and patient-centered care for the region.
Project Highlights
- Total Expansion Size: 80,000 square feet.
- Location: Adjacent to current hospital, connected by enclosed pedestrian bridge.
- Estimated Completion: June 2027.
- Project Cost: $100 Million.
Key Features
- Expanded Emergency Department
- Doubles current ED space
- Designed to accommodate up to 60,000 patient visits annually.
- Modern trauma and triage areas to improve flow and reduce wait times.
- New Intensive Care Unit (ICU)
- Expands ICU from 10 to 24 private patient rooms.
- Enhanced technology and space for complex, high-acuity care.
- Private Inpatient Rooms
- Adds 24 private rooms on the second floor, allowing for all-private acute care nursing units.
- Enhances patient privacy, comfort, and infection control.
- Relocated Helipad
- Rooftop location directly above the new ED.
- Faster access for air medical transport.
- Pedway Connector
- Climate-controlled bridge linking new expansion with existing hospital.
- Ensures safe and efficient patient transfers.
- Power Plant and Chiller Expansion
- Supports increased energy demands and system reliability.
- NICU Growth Opportunity
- Current ICU space to be converted into an expanded Neonatal Intensive Care Unit.
- NICU to grow from 2,165 sq. ft. to 6,647 sq. ft.
Community Impact
- Strengthens emergency response capacity for the region.
- Increases access to critical care close to home.
- Positions Baptist Health Corbin as a hub for advanced inpatient services in southeastern Kentucky.